{"id":207,"date":"2015-01-02T20:38:40","date_gmt":"2015-01-02T20:38:40","guid":{"rendered":"http:\/\/www.pearman.cc\/blog\/?p=207"},"modified":"2015-01-06T17:19:31","modified_gmt":"2015-01-06T17:19:31","slug":"c303-cv-boot","status":"publish","type":"post","link":"http:\/\/www.pearman.cc\/blog\/tgb13\/c303-cv-boot\/","title":{"rendered":"C303 cv boot"},"content":{"rendered":"<p>I&#8217;ve a few different sub projects on the go right now, not finishing any of them, but hey ho.<\/p>\n<p>this one will document the swapping of the cv boot.<\/p>\n<p>the axle is off the truck so access is easy. \u00a0I made an axle trolley by welding a couple of cheap bottle jack onto my broken engine crane stand.<\/p>\n<p>trying to remove the bump stop plate was a pain. \u00a0As always 2 of the 3 fixings came out but there is always 1 that won&#8217;t. \u00a0That one had to be drilled out and re tapped. \u00a0Not sure what it was to start with, but now it&#8217;s m6<\/p>\n<p><a href=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-208\" src=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image-300x224.jpg\" alt=\"image\" width=\"300\" height=\"224\" srcset=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image-300x224.jpg 300w, http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image-1024x765.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>next i have made a wheel carrier using some scrap iron and my engine stand. \u00a0then ran out of time.<\/p>\n<figure id=\"attachment_209\" aria-describedby=\"caption-attachment-209\" style=\"width: 300px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-209\" src=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image1-300x224.jpg\" alt=\"wheel carrier stand\" width=\"300\" height=\"224\" srcset=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image1-300x224.jpg 300w, http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image1-1024x765.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-209\" class=\"wp-caption-text\">wheel carrier stand<\/figcaption><\/figure>\n<p>2 guide pins created out of 1\/2&#8243; UNC bolts inserted<\/p>\n<figure id=\"attachment_212\" aria-describedby=\"caption-attachment-212\" style=\"width: 300px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-212\" src=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image2-300x224.jpg\" alt=\"brake pipe connections removed and guide pins inserted\" width=\"300\" height=\"224\" srcset=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image2-300x224.jpg 300w, http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image2-1024x765.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-212\" class=\"wp-caption-text\">brake pipe connections removed and guide pins inserted<\/figcaption><\/figure>\n<p>Wheel carrier removed<\/p>\n<p><a href=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image4.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-214\" src=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image4-300x224.jpg\" alt=\"image\" width=\"300\" height=\"224\" srcset=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image4-300x224.jpg 300w, http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image4-1024x765.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>CV boot teased out with a pry bar<\/p>\n<figure id=\"attachment_215\" aria-describedby=\"caption-attachment-215\" style=\"width: 300px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image5.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-215\" src=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image5-300x224.jpg\" alt=\"OMG what is this crud in here\" width=\"300\" height=\"224\" srcset=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image5-300x224.jpg 300w, http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image5-1024x765.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-215\" class=\"wp-caption-text\">OMG what is this crud in here<\/figcaption><\/figure>\n<p><a href=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image6.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-216\" src=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image6-300x224.jpg\" alt=\"image\" width=\"300\" height=\"224\" srcset=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image6-300x224.jpg 300w, http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image6-1024x765.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>any clue what this is? looks like grease and mud<\/p>\n<p>I&#8217;m guessing this should not be here. \u00a0Any clues how to clean this up?<\/p>\n<p>Wiped out as much as i could then injected some new oil in to wash the rest off. \u00a0I was a bit worried that the inside of the hub would be coated in this moose, but draining the oil showed it was ok.<\/p>\n<p>Fitting the new boot was a fiddle. \u00a0as i pushed one side in the other came out. \u00a0Ended up cutting a 10cm section of 4&#8243; pipe and using that, with a hammer to push it in<\/p>\n<figure id=\"attachment_218\" aria-describedby=\"caption-attachment-218\" style=\"width: 300px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image7.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-218\" src=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image7-300x224.jpg\" alt=\"oil drained fine\" width=\"300\" height=\"224\" srcset=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image7-300x224.jpg 300w, http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image7-1024x765.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-218\" class=\"wp-caption-text\">oil drained fine<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_219\" aria-describedby=\"caption-attachment-219\" style=\"width: 300px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image8.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-219\" src=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image8-300x224.jpg\" alt=\"10cm, 4&quot;&quot;x3mm pipe\" width=\"300\" height=\"224\" srcset=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image8-300x224.jpg 300w, http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image8-1024x765.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-219\" class=\"wp-caption-text\">10cm, 4&#8243;&#8221;x3mm pipe<\/figcaption><\/figure>\n<figure id=\"attachment_214\" aria-describedby=\"caption-attachment-214\" style=\"width: 300px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image4.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-214\" src=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image4-300x224.jpg\" alt=\"Sliding the carrier back in\" width=\"300\" height=\"224\" srcset=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image4-300x224.jpg 300w, http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image4-1024x765.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-214\" class=\"wp-caption-text\">Sliding the carrier back in<\/figcaption><\/figure>\n<p>It proved not to want to go back in. \u00a0problem was that the splines in the half shaft did not quite line up in the diff. \u00a0quick fiddle with the diff flange and straight in.<\/p>\n<p>The book said to put some sealant in this joint but there was non in there \u00a0before so I have not. \u00a0time will tell<\/p>\n<p>bolts tightened up to 110nm<\/p>\n<p>oil filled up, done. \u00a0Make sure the shaft end of the \u00a0boot is a nice fit in the joint. \u00a0I had 2 goes<\/p>\n<p><a href=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image10.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-221\" src=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image10-300x224.jpg\" alt=\"image\" width=\"300\" height=\"224\" srcset=\"http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image10-300x224.jpg 300w, http:\/\/www.pearman.cc\/blog\/wp-content\/uploads\/2015\/01\/image10-1024x765.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a> (5055)<\/p>\n<div class=\"clearfix\"><span class='ldc-ul_cont' onclick=\"alter_ul_post_values(this,'207','like')\" >Likes<img decoding=\"async\" src=\"http:\/\/www.pearman.cc\/blog\/wp-content\/plugins\/like-dislike-counter-for-posts-pages-and-comments\/images\/up.png\" \/>(<span>3<\/span>)<\/span><span class='ldc-ul_cont' onclick=\"alter_ul_post_values(this,'207','dislike')\" >Dislikes<img decoding=\"async\" src=\"http:\/\/www.pearman.cc\/blog\/wp-content\/plugins\/like-dislike-counter-for-posts-pages-and-comments\/images\/down.png\" \/>(<span>0<\/span>)<\/span><\/div>","protected":false},"excerpt":{"rendered":"<p>I&#8217;ve a few different sub projects on the go right now, not finishing any of them, but hey ho. this one will document the swapping of the cv boot. the axle is off the truck so access is easy. \u00a0I made an axle trolley by welding a couple of cheap bottle jack onto my broken &hellip; <a href=\"http:\/\/www.pearman.cc\/blog\/tgb13\/c303-cv-boot\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">C303 cv boot<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,5],"tags":[],"class_list":["post-207","post","type-post","status-publish","format-standard","hentry","category-c303","category-tgb13"],"_links":{"self":[{"href":"http:\/\/www.pearman.cc\/blog\/wp-json\/wp\/v2\/posts\/207","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.pearman.cc\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.pearman.cc\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.pearman.cc\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.pearman.cc\/blog\/wp-json\/wp\/v2\/comments?post=207"}],"version-history":[{"count":7,"href":"http:\/\/www.pearman.cc\/blog\/wp-json\/wp\/v2\/posts\/207\/revisions"}],"predecessor-version":[{"id":225,"href":"http:\/\/www.pearman.cc\/blog\/wp-json\/wp\/v2\/posts\/207\/revisions\/225"}],"wp:attachment":[{"href":"http:\/\/www.pearman.cc\/blog\/wp-json\/wp\/v2\/media?parent=207"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.pearman.cc\/blog\/wp-json\/wp\/v2\/categories?post=207"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.pearman.cc\/blog\/wp-json\/wp\/v2\/tags?post=207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}